Damage to the floors, as well as the interior and exterior walls, was compromising the structural integrity of their commercial building.
We were required to excavate and remove all damaged areas, before replacing them with new fit-for-purpose concrete repairs.
We also installed a new mezzanine steel system, including a full replacement of the client’s existing mezzanine floor. Originally, this floor was installed and held up using a concrete block wall for strength, however, this was no longer fit-for-purpose. For that reason, we put a plan in place to replace the wall with a new hot-rolled steel frame more suited to the requirements of their building.