t: 0191 359 2339
We are a leading North East supplier and installer of structural steel framed buildings. Our goal is to offer a long term, robust and quality assured solution for businesses and organisations across the UK looking to grow. Offering expert guidance and support from the initial consultation and survey through to the rapid installation of the steel framed building, we are committed to delivering excellence at every stage of your project.
In our initial consultation, we will take the time to get to know your business and processes in order to build an indepth picture of your steel framed building requirements and any requested features; these can include commercial grade entry and roller shutter doors, window shutters, skylights, insulation and any additional structural elements that could add to the strength and longevity of your building.
At this stage, we will also give a no obligation quote for the proposed project. We pride ourselves on providing a quote with no hidden fees and offer each client complete transparency throughout the entire process.
We provide more than just steel frame buildings – we also provide peace of mind, taking away the stress often associated with the planning process.
We assist many of our clients with the submission of planning applications, supplying structural and elevation drawings, design and access statements, as well as flood risk assessments. We have cooperated with a number of local authorities throughout the UK to ensure that the planning applications for our clients are successful.
We want to make the process of constructing a steel frame building as seamless and hassle free as possible for every client. If Building Control Regulations apply in your area, we will liaise with the local council/private building inspectors to ensure that all site inspections are carried out at an appropriate time and that the building is signed off prior to occupancy and handover, preventing any potential delays to the project.
We offer a full turnkey solution. From the initial site survey and planning applications to arranging the groundwork, creating drainage designs and installing brickwork and blockwork, our project manager will oversee the project in its entirety and ensure that you are kept informed at every stage. We can also offer support and guidance during the internal fit-out of the steel frame building and we are on hand with any questions you may have post-installation.
No matter how simple or complex your steel fabrication requirements may be, we will offer the same professionalism, attention to detail and friendly, expert advice to every client, ensuring that you receive a cost effective and quality construction that your business can be proud of.
As a CE marked supplier and installer of steel framed buildings, our priority is ensuring that the buildings that we construct are structurally compliant and fit for purpose. Wherever your business may be based in the UK, we will deliver and erect the steel frame on site, providing a dedicated in-house team of engineers and industry experts who are able to meet tight deadlines and offer tailored advice in all areas of the project, from civil engineering to site management and health and safety.
Thinking about a steel building but not sure where to start? Here are the questions we’re asked most often. If yours isn’t covered, give us a call on 0191 359 2339 and we’ll happily talk it through.
We take the time to understand your business, your requirements and your intended use for the building. We gather all the information needed to design the right structure and provide a no-obligation quote with no hidden fees.
Yes. We assist many clients with planning applications, supplying structural and elevation drawings, design and access statements and flood risk assessments. We work with local authorities across the UK to give your application the best chance of success.
A dedicated project manager oversees the entire project from initial survey through to final handover. They coordinate all trades, liaise with Building Control and keep you informed at every stage.
Timescales depend on the size and complexity of the build, but steel frame buildings go up significantly faster than traditional construction. Your project manager will give you a clear programme from the outset.
Yes. Our team is on hand to answer any questions you have post-installation. We do not disappear once the job is done.
Leave Your Name and Number and One of the Team Will Ring You Back.
Or Call Us Now on 0191 359 2339