YEOVIL INDUSTRIAL UNIT REFURBISHMENT

Giving an old industrial unit an extensive facelift. Started and completed in 2022, this large development project involved the demolition and repurposing of an industrial site which had previously been used by the Ministry of Defence. One of the most challenging aspects of this project was the age and condition of the existing hot-rolled steel […]
WELSH FOOTBALL ASSOCIATION

Maintenance Building. We were approached by a representative of the Welsh FA to see if we would be interested in being part of a development in Wrexham to create a state-of-the-art training facility for the senior football team. The Welsh FA asked if we could keep the development quiet until everything had been approved and […]
VOLVO TRUCK AND BUS CENTRE

Laying a new foundation and other civil works. We were contracted by Teeside-based Volvo Truck & Bus Centre to carry out groundwork and civil engineering works on their site due to ground movement in the surrounding areas of the building’s footprint. Ground movement can have a huge impact on a building’s foundations. This is because […]
TONY MANSFIELD

Cold Rolled Storage Building Our client had an existing building which he wanted to extend. He asked us to provide a turnkey project to include the groundwork. We designed the client a cold rolled portal frame steel building which gave him a seamless look. The building was installed onto a 150mm reinforced concrete floor slab […]
Thorpe Design & Technologies Ltd

Bespoke Cold Rolled Steel Extensions We designed and installed a bespoke cold rolled steel duo pitch extension for Thorpe Design & Technologies Ltd to provide them with essential space to incorporate a new spray booth facility. Designing a cold rolled steel building is always a challenge, but connecting it to an existing structure adds an […]
THIRTEEN GROUP

Piling system & retaining wall The foundations of our most recent project for the Thirteen Group are now complete and ready for the bricklayers to arrive and begin further works. Our client had requested a piling system and a retaining wall to be installed within a residential garden in Hartlepool. This project was complicated for our team, […]
The Metal Drum Company – Break Testing Area

Groundworks for break testing facility installed in Ferryhill. We were asked by our client at the Metal Drum Company to design and install the groundworks for their state of the art break tester unit. We were proud to support our client, The Metal Drum Company, with the full design and installation of the groundworks for […]
THE METAL DRUM COMPANY

Secure storage building The Metal Drum Company contracted us to design and supply a brand-new, bespoke secure storage building on their premises. We constructed a facility measuring 20m x 15m x 6m in Juniper Green with matching-coloured doors. This building was designed for both security and efficiency, ensuring a reliable storage solution for their manufacturing […]
THE HERRING GIRL STATUE, NORTH SHIELDS

Concrete plinth installed in North Shields Over the past few weeks, the Hamilton Steel team has been hard at work on a project in collaboration with North Tyneside Council to honour the Fish Quay’s heritage and culture. The council planned to introduce a new monument to recognise the significance of the role that herring girls played in […]
Teesworks LV Building

LV Steel Building – Teesworks Project Overview A purpose-built LV steel building delivered at Teesworks to accommodate low-voltage electrical infrastructure within a demanding industrial environment. The Brief To provide a robust, compliant building capable of housing LV electrical equipment, ensuring safe operation, ease of access, and long-term performance while aligning with site and programme requirements. The Challenge The building […]