Hot Rolled Skip Storage Building in Seaham
As part of Biffa Polymers‘ multi-million-pound development in Seaham, we were asked to design, supply and install a building to house a number of commercial skips.
The building needed to be tall, at 9.1m, so we designed it in hot rolled steel as a mono pitch structure. It’s 16m x 8m and clad in KS1000rw 40mm composite panels in Goosewing Grey, with one side left open so the skips can be moved in and out.
Foundations Sized to the Steel
Our engineer designed the foundations from the steel structural calculations, so every column base was sized for the load it carries. The pads ranged from 1500mm x 1500mm x 650mm up to 2200mm x 2200mm x 1200mm. If you want to know more about how we work out foundations, see steel building foundations explained.
Project Details
| Client | Biffa Polymers |
| Location | Seaham, County Durham |
| Project Type | Industrial skip storage building |
| Frame | Hot rolled steel, mono pitch |
| Building Dimensions | 16m x 8m x 9.1m |
| Floor Area | 128m² |
| Cladding Specification | KS1000rw 40mm Composite Cladding |
| Cladding Colour | Goosewing Grey |
| Foundations | Column base pads from 1500mm x 1500mm x 650mm to 2200mm x 2200mm x 1200mm |
| Scope | Full turnkey: design, supply and install |