Foundation and Doorway Infill Works at Darlington Town Hall
We worked alongside St Astier Limited on an exterior concrete restoration project at Darlington Town Hall. Our part of the job was the foundation work and infilling two of the building’s existing doorways so the restoration could be finished.
We carried out the groundwork on site and exposed the existing pile caps so the new design could be installed. Once the concrete was in, we struck the shuttering and put the block paving back, leaving the area outside the Town Hall as we found it.
Working on a Public Building
Town centre jobs come with tight working space, a public footpath right next to the work and a building that can’t be damaged. The digging was done with a mini digger inside the old doorways and the concrete was pumped in from the road. The work was done by Rob, Shaun, Nigel, Billy, Danny and Jake.
Project Details
| Client | St Astier Limited |
| Location | Darlington Town Hall, Darlington |
| Project Type | Groundwork, foundations and doorway infill |
| Scope | Groundwork, exposing existing pile caps, foundations for the new design, infilling two doorways, reinstating block paving |