The building was designed in cold rolled steel with six industrial roller shutter doors, PA Doors and Fire Exits as the client was looking to split the overall unit into smaller units.
Our Engineer designed the groundwork foundations based on the structural calculations and we placed the building on a 200mm reinforced concrete floor slab.