We supplied the client with new hot rolled door frames which were attached to the existing purlin’s. We then created two openings 4m wide x 6m high through the existing made up system.
Once the frames were installed and the “poppy red” flashing’s to match the existing building were in place, the industrial specification three phase roller shutter doors were fitted.