t: 0191 359 2339
Hamilton Steel Buildings designs, supplies and installs industrial and commercial steel buildings across Redcar and Cleveland, from Teesworks and the land along the river to Kirkleatham, Dormanstown, Marske and Saltburn.
Most of our work in Redcar has been at Teesworks, on the old steelworks site. We’ve delivered a high voltage building and a low voltage building there, each 14.6m x 6.125m with 3.2m eaves and finished in Anthracite cladding, built to programme on a live industrial site.
We also built the steel building for the 11,000kV substation and a P&C control room for the SeAH Wind project, working with Electricity North West. The substation supplies power across the Teesside Freeport.
Land around Redcar has a long industrial history, so we never assume what’s under the ground. Our own groundworks team surveys the site and designs the foundations around the frame and the ground conditions.
Industrial Steel Buildings in Redcar
Workshops, production space and warehouses for Teesworks, Kirkleatham and the estates around Redcar, with roller shutters, personnel doors and insulated cladding to suit. More on our industrial steel buildings.
Buildings for Electrical and Utility Equipment
Substation, switchgear and control room buildings designed around equipment access and future maintenance, based on our work at Teesworks.
Commercial Steel Buildings in Redcar
Trade units, showrooms and commercial buildings, designed and built by one team. See our commercial steel buildings.
Secure Storage Buildings
Single skin or insulated storage for plant, vehicles and stock. Our special offer buildings are a good place to start if a standard size fits.
Groundworks and Foundations
Pads, rafts, ring beams and reinforced slabs designed by our engineers from the frame loads. See construction groundwork.
We’re a family run firm, set up in 2017 by Managing Director Chris Hamilton, who has more than 20 years in construction. Chris is still involved in every job.
You get one project manager from the first site visit to handover, and the GA drawings and structural calculations you need for Building Control are included free of charge. We’re SafeContractor approved, and our netting and edge protection is put up by FASET-approved riggers, which matters on sites like Teesworks. Planning in Redcar is handled by Redcar and Cleveland Borough Council, and we can manage the application for you. Our guide to planning permission for steel buildings explains when you’ll need it.
As well as Redcar itself we cover Dormanstown, Kirkleatham, Marske-by-the-Sea, New Marske, Saltburn, Eston, Grangetown, South Bank and Guisborough. Nearby we also have pages for Middlesbrough, Stockton-on-Tees and Hartlepool. See all the areas we serve.
Yes. At Teesworks we’ve built the HV and LV buildings and the steel building for the SeAH substation and control room.
It depends on the size, where it’s going and what the land is used for now. Some buildings come under permitted development and others need an application to Redcar and Cleveland Borough Council. We’ll tell you which applies before you spend anything on drawings, and we provide the structural calculations and GA drawings for Building Control free of charge.
Yes. Our Teesworks buildings went up on a live industrial site. Every project comes with risk assessments, method statements and a construction phase plan, and we plan the work around what’s happening on site.
It mostly comes down to size, cladding, doors and the ground. Our guide to how much a steel building costs shows real prices, and we’ll give you an accurate quote once we’ve seen the site.
Leave Your Name and Number and One of the Team Will Ring You Back.
Or Call Us Now on 0191 359 2339