We designed a hot rolled building to constrado and connected to the existing building on three sides. Due to the fire boundary conditions KS1000rw cladding was used on the side elevations. The building design incorporated a 20 degree pitch on the roof to create more internal space for storage. We also supplied a retractable bespoke door on the front gable to give the client exactly what they were looking for at the beginning of the design process.
This was a very challenging project but the results speak for itself.