We designed the building in cold rolled steel with 40mm composite cladding to give the client some insulation in the unit. The groundwork’s consisted of column base support pads and a 150mm reinforced concrete floor slab. The building was also supplied with an industrial 4m x 5m electric galvinised roller shutter door.