MIXED FREIGHT SERVICES

Hot Rolled Steel Extension to Existing Building

Mixed Freight Services Ltd are a company based at Heathrow International Airport and have been looking a ways to create more storage on their exisiting site for a considerable length of time. They approached us to design a building for them that connected to their existing building creating extra height.

We designed a hot rolled building to constrado and connected to the existing building on three sides. Due to the fire boundary conditions KS1000rw cladding was used on the side elevations. The building design incorporated a 20 degree pitch on the roof to create more internal space for storage. We also supplied a retractable bespoke door on the front gable to give the client exactly what they were looking for at the beginning of the design process.

This was a very challenging project but the results speak for itself.

Project details

Building Dimensions

24.5m x 20m x 6.01m

Cladding Specification

KS1000rw 40mm Composite Cladding

Cladding Colour

Goosewing Grey (RAL 0807005)

Golf club greens shed extension.

Every stage of our project with HamiltonSteel BuildingsLtd was conducted in a professional manner.

Planning, design, communication, and construction could not have been better. I am more than happy to recommend Chris and his company.

Roy Heathcote Facilities Manager Fairfield Golf Club

Would not hesitate to use Hamilton Steel

Would not hesitate to use Hamilton Steel Buildings again. Excellent quality. Good price. Found all concerned efficient, helpful and with good communication. Building delivered on-time. Guys erecting the building arrived when advised and on time every day – they also worked as a very efficient and tidy team.

Top Drawer Service and Build

Chris is one of the nicest and amenable contractors I have ever dealt with. He is thorough and all jobs are completed to an excellent standard. I couldn’t recommend this guy enough, Thanks Chris for the hard slog we have had to endure on this latest build!! Looking forward to the next one!!