Bridge Removal & Reinstatement Works
Bridge Removal Services
Hamilton Steel Buildings Ltd, working on behalf of Darlington Council, was tasked with a challenging and important project: the safe removal of an existing bridge at Northgate in Darlington.
The project required careful planning and precise execution to ensure the safety of the surrounding area while maintaining access for local residents and businesses. Our team successfully dismantled the bridge and provided new, reliable access solutions for the tenants of a nearby house and adjacent business premises.
This project demonstrates our commitment to delivering safe, efficient, and fully managed construction and removal services. From bespoke planning to seamless execution, Hamilton Steel Buildings Ltd ensures minimal disruption and maximum safety on every project.

This project presented a number of engineering challenges. To safely dismantle the existing bridge, our team installed scaffolding above the river, creating a secure working platform. This allowed us to carry out demolition safely while ensuring the river remained completely uncontaminated, protecting the local environment throughout the process.
Following the removal, bespoke reinforced walls were designed and installed to support a new GRP walkway, providing safe and durable access for residents and business users. Every step of the project was carefully planned and executed, from demolition to the installation of the new structure, ensuring minimal disruption and maximum safety.