
The Metal Drum Company – Break Testing Area
Groundworks for break testing facility installed in Ferryhill.
We were asked by our client at the Metal Drum Company to design and install the groundworks for their state of the art break tester unit.

We were proud to support our client, The Metal Drum Company, with the full design and installation of the groundworks for their new state of the art brake testing facility.
This project required more than just precision construction it demanded intelligent planning and integration with the client’s live operational environment. One of the key challenges was to create a seamless access route for HGVs entering and exiting the testing facility, all without disrupting ongoing site activities.

Through strategic design and phased implementation, we delivered a solution that ensures uninterrupted vehicle movement, robust ground stability, and long term durability providing our client with a fully operational testing facility that meets the highest industry standards.
This project reflects our ability to deliver smart, site sensitive groundwork solutions for complex industrial requirements.








